
New TopShim run:

version = topshim 2.0.0
date = 2025-03-12
time = 11:44:25.285
command = topshim 

FINE SHIMMING

Parameters:

probe = Z114607_0045
solvent = D2O
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration  1: FWHM Before= 0.6 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  4: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.352

shim changes: 
Z	-25
Z2	+65
Z3	-128
Z4	+532
Z5	-25
Z6	-747
Z7	-3588
Z8	+7668

duration = 2 min 3 sec
completed successfully
finished Wed Mar 12 11:46:26 2025


========================================================================
